On January 9, 2023 at 3:00:56 PM +0200, Gravatar hylli:
  • Updated description of Kampusareena solar power plant from

    Electrical measurements from the 4 inverters of the solar power plant of Kampusareena. The maximum power production of the solar plant is 57 kW. See the [ProCem](https://ckan.energydata.rd.tuni.fi/organization/about/procem) project for general information about how the measurements are stored and can be used. See the [Kampusareena](https://ckan.energydata.rd.tuni.fi/group/about/kampusareena) group for general information about the building. Note: This is not fully documented for example available measurements are missing.
    to
    Electrical measurements from the 4 inverters of the solar power plant of Kampusareena. The maximum power production of the solar plant is 57 kW. Collected measurements include frequency, current, voltage, power and energy. NOTE: Data collected before 2018-08-08 may contain erroneus data in the form of large negative numbers like -2147483648. This is because the collection system misinterpreted the value signaling that there were no data since the inverter was not operating. this often occurred during night time. See the [ProCem](https://ckan.energydata.rd.tuni.fi/organization/about/procem) project for general information about how the measurements are stored and can be used. See the [Kampusareena](https://ckan.energydata.rd.tuni.fi/group/about/kampusareena) group for general information about the building. Note: This is not fully documented for example available measurements are missing.


  • Changed value of field temporal_resolution to 1 second in Kampusareena solar power plant