On February 2, 2023 at 9:58:01 AM +0200, Gravatar hylli:
  • Updated description of Kampusareena solar power plant inverters from

    Electrical measurements from the 4 inverters of the solar power plant of Kampusareena. The maximum power production of the solar plant is 57 kW. The power output goes to the top floor ventilation machine room. Collected measurements include frequency, current, voltage, power and energy. The inverters are the following: - For the west wall 1x SMA STP8000TL (8 kW) - For the south-west wall 1x SMA STP15000TL (15 kW) - For the south-east wall 2x SMA STP17000TL (2 x 17 kW) NOTE: Data collected before 2018-08-08 may contain erroneus data in the form of large negative numbers like -2147483648. This is because the collection system misinterpreted the value signaling that there were no data since the inverter was not operating. this often occurred during night time. See the [ProCem](https://ckan.energydata.rd.tuni.fi/organization/about/procem) project for general information about how the measurements are stored and can be used. See the [Kampusareena](https://ckan.energydata.rd.tuni.fi/group/about/kampusareena) group for general information about the building. Note: This is not fully documented for example available measurements are missing.
    to
    Electrical measurements from the 4 inverters of the solar power plant of Kampusareena. The maximum power production of the solar plant is 57 kW. The power output goes to the top floor ventilation machine room. Collected measurements include frequency, current, voltage, power and energy. The inverters are the following: - For the west wall 1x SMA STP8000TL (8 kW) - For the southwest wall 1x SMA STP15000TL (15 kW) - For the southeast wall 2x SMA STP17000TL (2 x 17 kW) NOTE: Data collected before 2018-08-08 may contain erroneus data in the form of large negative numbers like -2147483648. This is because the collection system misinterpreted the value signaling that there were no data since the inverter was not operating. this often occurred during night time. See the [ProCem](https://ckan.energydata.rd.tuni.fi/organization/about/procem) project for general information about how the measurements are stored and can be used. See the [Kampusareena](https://ckan.energydata.rd.tuni.fi/group/about/kampusareena) group for general information about the building. Note: This is not fully documented for example available measurements are missing.